Per-Rack Cooling Capacity
• ≥120kW (supports GPU clusters), using cold-plate liquid cooling + air cooling assistance.
We provide full-chain thermal management solutions for next-gen computing infrastructure, from chip to cooling tower.
120kW+ cooling capacity per rack, zero cooling downtime record, keeping critical loads like NVIDIA H100/A100 running in optimal range
Service Targets: Supercomputing centers, AI training clusters, Tier 3/4 data centers, enterprise self-built data centers.
• ≥120kW (supports GPU clusters), using cold-plate liquid cooling + air cooling assistance.
• Liquid cooling (cold plate/immersion) / air cooling hybrid deployment, compatible with existing air cooling architecture, gradually adding liquid cooling nodes.
• SUS304 stainless steel body, 100% X-ray weld quality inspection, corrosion-resistant, zero leakage.
• High-to-low voltage integrated access (480V/208V), no power distribution room modification needed, saving 30% distribution cost.
• Stable operation at 55℃ high temperature, tested in Texas summer, no condensation at 95% relative humidity.
We don't just deliver equipment — we deliver "Cooling as a Service" — including thermal load verification, adaptive control, and full-lifecycle O&M.
• Retain existing air cooling architecture, gradually deploy liquid cooling nodes by zone, avoiding full system renovation risk.
• Using CFD thermal simulation + measurement calibration, locate hot spot blind zones in advance, ensuring no temperature exceedance after deployment.
• Dynamic cooling allocation adjustment based on real-time load, PUE can be optimized below 1.25.
• Start with non-critical areas, then core areas, achieving zero-downtime launch.
• For high-power chips like NVIDIA H100/A100 (TDP 700W+), customized cold plate solution, hot spot temperature reduced by 18℃.
• Integrated transformer and distribution unit, direct access to 480V/208V system, no additional distribution modification needed.
• Average 8 weeks from assessment to deployment, equipped with dedicated project manager coordinating civil, electrical, HVAC disciplines.
• 7×24 cloud monitoring + North American local team on-site support, 4-hour fault response.
A: We currently serve Texas deeply and can expand nationwide based on project needs.
A: For urgent issues, we guarantee initial response within 4 hours and on-site support within 24 hours for Texas projects.
A: Yes, we provide US deployment and service support for qualifying Chinese partners, ensuring compliance-ready execution.